Mechanical Engineering, Technical University of Darmstadt
Aeronautics and Astronautics, Technical University of Braunschweig
Graduated as Dipl.-Ing. (TU) in 1967
Dr.-Ing. (Fluid Dynamics) in 1970, Technical University of Munich
PROFESSIONEL QUALIFICATION
Wissenschaftlicher Assistent (Technical University of Munich, Germany)
Research Associate (Stanford University, USA)
Department Manager of plant operations for steam boilers and industrial power plants (Borsig GmbH)
Manager of Engineering in an international consulting company (Metra Proudfoot International)
Project Manager for chemical and petrochemical plants (Linde AG)
Project planning and control with MS-Project and Primavera P3 (Linde AG)
Construction / Commissioning Coordinator for an insuline plant (Ing.-Buero Dr. Schroeder)
OQ-Manager for an
insuline plant (Ing.-Buero Dr. Schroeder)
Project planning
and control with Primavera P3e (Ing.-Buero Dr. Schroeder)
Project Management Consultant
PROFESSIONEL EXPERIENCE
2001-2005 Ingenieurbuero Dr. Schroeder
2005:
Consultant
for Nuclear Power Plant Project Execution for Sofinel S.A., a subsidiary of
EDF and FRAMATOME ANP, France
2004:
Review
and Improvement of theTime Schedule for the Nuclear Power Plant
Olkiluoto,Finland
(for Framatome GmbH, Erlangen, Germany) with Primavera for the
Enterprise P3e
Ressource
Management for the same project
Project
planning and control for the Nuclear Power Plant Olkiluoto, Finland
(Engineering part of Sofinel S.A.) with Primavera for the
Enterprise P3e
2003:
Project
planning and control with Primavera for the Enterprise
2002:
Construction / Commissioning Coordinator
for Lantus (Insuline Glargine) Plant, Aventis Germany
OQ-Manager
(Operational Qualification) for Lantus (Insuline Glargine) Plant, Aventis
Germany
2001:
Project planning and control for Lantus (Insulin Glargine)
Plant, Aventis Germany
1985-1999 with Linde AG
1999:
Project planning and control for ethylene plant Ruwais
1998:
Implementation of Primavera P3 within Linde VA
1996 - 1998:
Project planning and control for the H2/CO - Plant Jamnagar, India
Project planning and control for hydrogen plant Ulsan (Korea)
Development of standard network plans with Primavera P3
1993 - 1995:
Project planning and control for the 350,000 mta ethylene plant Novy Urengoy, USSR
Project planning for the polyethylene plants Kalush (Russia) and Boehlen (Germany)
Test of standard project management software (MS-Project, Artemis,
Power Project,
Primavera, CA-Superproject, etc.)
1991 - 1992:
IT-Coordinator
1988 - 1990:
Proposal and engineering manager for the 350,000 mta olefins
plant (gas cracker) in
El Tablazo, Venezuela (Pequiven)
1987:
Project manager for process design and basic engineering for
a rock cavern conversion from
naphtha storage to cold propane service, Statoil Petrokemi AB,
Sweden
1986:
Proposal manager for various projects:
-Gujarat Petrochemical Complex, India
-400,000 mta olefins plant, India
-Process design handbook, Statoil Petrokemi AB, Sweden
-200,000 mta olefins plant, Venezuela
1985:
Design engineer for flow diagrams, technical specifications and
basic engineering of instrumentation
1984 with Metra Proudfoot International
1984:
Manager of engineering, responsible for energy saving projects
and productivity improvements in
various industries: refineries, chemical plants, steel works
(Europe, USA and Canada)
1982-1983 with Borsig GmbH
1982 - 1983:
Department manager of plant operations, responsible for all activities
regarding pre-commissioning,
start-up, performance tests and operation of steam boilers from
3.5 MW up to 750 MW.
-Coal-fired Benson-type steam boilers (130 MW and 750 MW) in Germany
-Several gas/oil-fired steam boilers with natural circulation
(up to 400 t/h each) in Germany,
Libya and United Arab Emirates (Ruwais)
-Waste heat boilers in Germany and CSSR
-Oil-fired steam boilers with natural circulation (400 MW each) in Venezuela
-Coal-fired industrial power plant (3.5 MW) in Germany
1974-1981 with Linde AG
1981:
Assistant commissioning manager on a 300,000 mta olefins plant (naphtha cracker) in Portugal
1980:
Commissioning supervisor on a 250,000 mta olefins plant (naphtha cracker)
1980:
Supervising project engineer for cracking and overload operation
measurements on a
300,000 mta olefins plant (gas cracker) in Norway
1979:
Commissioning engineer including supervisory responsibility for the performance test on:
-60,000 mta high-density polyethylene plant in Norway
-325,000 mta olefins plant (naphtha cracker) in Spain
Consultant engineer on olefins technolgy for Snam Progetti
1977 - 1978:
Commissioning engineer and performance test advisor on a 300,000
mta olefins plant (gas cracker)
with an air separation plant in Norway
Process coordinator for a methanol plant in India
Process supervisor for a cracking furnace modernization project in the USA
1974 - 1977:
Process design and calculations, economic feasability studies,
process development and optimization,
equipment design for various chemical and petrochemical plants